The car came to us with a bit of rust, so it will be stripped to bare metal, repaired, and re-sprayed.
Please scroll down for photos of the restoration.
March 8, 2017:
Restoration is completed. The car looks absolutely phenomenal and the owner is extremely pleased. He drove away with the car yesterday!
March 2, 2017:
Restoration is just about completed! Everything is coming together nicely. The car was just aligned and test driving will commence.
January 23, 2017:
Most of the mechanics has been assembled and installed, the interior has been partially installed and some of the exterior bits have been installed. A technician is coming tomorrow to install a SunTek clear wrap to the car to protect the paint.
October 31, 2016:
The engine has been re-installed into the car, as well as the brakes , suspension, wheels and tires.
August 31, 2016:
The car has been moved to assembly and parts have been ordered. Assembly has begun and will continue in the coming weeks.
August 9, 2016:
The inside of the panels were painted last week, body work was completed, and the car was prepped and painted today.
July 14, 2016:
Body work is progressing still. The car is taped up and moved to the paint booth this morning for the first coat of primer.
May 12, 2016:
The metal work continues on the car as areas of rust are cut out and new sheet metal is installed.
April 19, 2016:
The car has been dis-assembled, the old paint has been stripped, and the rust is being repaired.